GatesAir: Facebook GatesAir: LinkedIn GatesAir: Twitter GatesAir: Instagram GatesAir: YouTube

MEDIA CENTER

Presentations



GatesAir Connect: Virtual Events

Contact your local sales representative today!

Presentations: Technology Instruction

Filter by Category: All Presentations  |  TV Broadcasting  |  Radio Broadcasting  |  GatesAir Products  |  Broadcast Strategies  |  Technology Instruction  |  Upcoming Innovations  |  State of the Industry

Transmitter & RF System Timing & Synchronization
Steven Rossiter

4/20/2023

Discusses the impact of timing and sync on the performance and signal quality of transmitter and RF systems, including ATSC 3.0

ATSC (NextGEN TV) SFN Application
Steven Rossiter

11/2/2022

General info on ATSC 3.0 single frequency network deployment, including timing & synchronization, coverage planning, and more

ATSC 1.0/2.0 SFN
Steven Rossiter

11/2/2022

TV single frequency network requirements and general info for 8VSB ATSC deployments

Total Cost of Ownership (TCO): The Economics of Deploying High-Efficiency Transmitters
Martyn Horspool

5/7/2020
GatesAir Connect: Virtual Events 2020

Reviewing major drivers of TCO, including repairability, modularity, footprint, and several other factors

FM Boosters 2.0 – It’s Not Your Father’s SFN
Rich Redmond and Hal Kneller (GBS)

4/8/2018
NAB Show 2018

Current state of SFN/booster technology, strategy, network design, and deployment; many real world examples shown

TV Spectrum Repack Process Update & ATSC 3.0 Considerations
Joe Seccia

10/12/2017
2017 IEEE Broadcast Symposium

US TV repack timeline update, reimbursement procedure, execution strategies/scenarios, and preparing for ATSC 3.0

Single Frequency Networks: SynchroCast™
Ted Lantz

4/23/2017
GatesAir Connect @ NAB Show 2017

Illustration of SFN broadcast applications and examples of optimized deployment

Planning for TV Spectrum Repacking and the Transition to ATSC 3.0
Joe Seccia

4/23/2017
NAB Show 2017

Discusses the planning process for repack, challenges to providing uninterrupted service during transition, and repack overview

Implications and Optimization of Coverage and Payload for ATSC 3.0
Steven Rossiter

4/23/2017
NAB Show 2017

Examines trade-offs between data payload, number/,type of services to be carried, and continued coverage with 3.0 transition

Interoperability of FM Composite Multiplex Signals in an IP Based STL
Junius Kim and Keyur Parikh

4/23/2017
NAB Show 2017

Reviews various MPX STL topologies, locations of needed elements, and networking requirements for robust signal transport
 1   2   3  Next
PRODUCTS SOLUTIONS SERVICES MEDIA CENTER COMPANY